Project Arc

Project Arc provides operational commanders with STEM resources and solutions to adapt to the rapidly changing technology environment expected in a Great Power Conflict.

About

Project Arc

Air and Space Force operational units need dedicated scientists and engineers who can quickly apply their specialized skills and knowledge to solve the technical problems encountered by warfighters in the field. Project Arc provides this capability at the point of need, where technicians can work directly with operators to prepare for conflict before it occurs.

Learn more about Project Arc’s team, origin, and fight to win on the battlefield with technological superiority below.

Program Overview

Projects

Improving F-16 Operational Availability

A technician embedded in the 56th Maintenance Group, Luke Air Force Base, Ariz., constructed a removal tool for the F-16 finger brace, a part that connects the wing to the body of the aircraft and when damaged during required maintenance requires a complete replacement of the wing, which costs roughly $1 million. Before the inception of this tool, Luke AFB, was averaging three wing changes a month due to finger brace damages during regular major aircraft inspection. Where implemented, this tool will eliminate recurring causes of damage, saving roughly $9 million and improving aircraft availability by 7 percent annually per F-16 Fighter Squadron.

Automating Base Contracting

Two technicians at Grand Forks Air Force Base, North Dakota, worked with the base contracting office to develop tools in the Python programming language that automatically redact sensitive information on contracts and track their status through completion, a process that otherwise would take up to three hours per contract. Augmenting their work with these tools, contracting officials are now able to expedite the timeline for contract approvals while maintaining proper privacy, security, and accountability.

KC-135 Cargo Lift for ACE

Two technicians developed an onboard system to load cargo in the KC-135 without the support of a forklift or scissor truck. Able to be stored in the aircraft within one cargo pallet position and assembled by two crew members in 30 minutes or less, this cargo lift will expand the tanker’s cargo loading capabilities in austere conditions, e.g. hoist a body on a stretcher in medevac missions or load and unload ACE equipment. The team is working with the 92d Air Refueling Wing to demonstrate this capability at AMC’s July Exercise, Mobility Guardian.

Pilot POC

Project Arc engineer scoped an intercept scenario between one adversary and two friendly jets to develop an autonomous agent for providing actionable recommendations to the pilot following a priority list of Survive, Kill, Mutual Support and Analyze with F-16 squadron at Luke Air Force Base and secured agreement with Air Force Research Laboratory’s Autonomy Capability Team/Autonomous Air Combat Operations to develop modules in AACO virtual training environment. Project Arc received a programmer from MIT Artificial Intelligence Accelerator Program to work four months full time on developing the agent. The end outcome is to have an agent that executes tactics in a virtual intercept environment to analyze most favorable actions for mission objectives.

Austere Mesh Radio Networks for Contingency Ops

Technicians embedded with the 621 Contingency Response Wing are evaluating the ability of mesh radio networks to solve the interoperability challenges of austere communication networks. Currently, the team is leading a $1 million field exercise integrating 20 devices from various locations across the US to demonstrate the mesh networks’ capability to develop a common operating picture and securely and seamlessly integrate MPU5 radios, Starlink, ATAK devices and other mission comm nodes. If successful, this operational test will inform command requirements and spending to outfit the entire wing with the capability.

“Jailbreaking” the F-35

A technician embedded at the Air Combat Command Federal Laboratory worked with the Joint Program Office and a non-traditional contractor to “jailbreak” the F-35 through a proof-of-concept onboarding of STITCHES, a DARPA developed combat decision aid software. The technician used his coding prowess to prepare the circuit cards for the software. This project, if successful, will secure government-owned and DevOps capable space on the jet and build trust with the Joint Program Office for future government-led technical efforts.

Pacific Air Forces Hypoxia Inquiry

At the request of the Office of the Air Force Chief Scientist, a PACAF technician probed past reported physiological events experienced by F-15 pilots at Kadena Air Base, Japan, that could lead to hypoxia. Characterized by lack of oxygen in bodily tissues, this condition can strike pilots flying at high altitudes in poorly pressurized cabins. Symptoms include confusion, bluish skin, difficulty breathing, fatigue and rapid heartbeat. Deploying to Kadena AB, the technician team gathered data with members of the 67th Fighter Squadron, 18th OSS Physiologists, F-15 System Program Office, Air Force Research Lab/711 Human Performance Wing, and 586th Flight Test Squadron. In less than a month, the team presented three courses of action for an aircraft agnostic, flight-test approved and relatively low-cost solution to provide the minimum physiological monitoring capabilities needed to provide real time warning of hypoxic conditions to pilots in the cockpit. The team is currently working with the AFCS to eventually sponsor an unfunded request to purchase and deploy the solution.

Testimonials

2nd Lt Jacob H. Geil

While the scale of each technician’s impacts can vary widely, I think it is clear that Project Arc has led to a significant improvement in our ability to develop rapid, low-cost, in-house solutions to a wide variety of problems.

1st Lt Kevin D. Tran

Project Arc is advancing the ability to deliver technological solutions to operational units when they need it. Based on our current construct by embedding technicians across the DAF, we are also enabling cross pollination across different organizations, bringing unique perspectives and skillsets which then further produce solutions to problems the units didn’t think they had.

A1C Hannah Garwood

During my experience with Project Arc, I saw myself grow exponentially in electronic design and implementation, data analytics, 3D printing, network troubleshooting, project management, BLOS/LOS communication systems, and most importantly….confidence to speak up.

LT. COL. CHRISTOPHER HANDY

Project Arc gave me a chance to develop my own technical skills in an immersive environment, while simultaneously applying my studies to actual Air Force problems. I walk away from the program with a network of skilled technical experts in every field, that I won’t hesitate to reach out to in the future!

MSgt Vincent F. Olshove III

Project Arc is the driving force behind the future of true innovation in the Air Force. As each Project Arc cohort deploys out across the force, we build a deeper network of trust and innovation that crosses all organizational boundaries. I truly believe that this network, built from technically minded Airmen & Guardians, will play an important role in shaping the way we address challenges in future conflict.

Should I Apply?

Regardless of education or specialized training, Project Arc technicians share core characteristics. Do you have what it takes to provide tailored, technical solutions for unique operational problems and adversarial technological deployments, now and in future conflict?

  • Passionate to develop and deliver tailored disruptive innovations to warfighters
  • Devoted to exploring the depth of science and technology for solutions
  • Committed to getting their hands dirty side-by-side with operators
  • Desire to selflessly go the extra mile to arm the warfighter, not for personal gain, but for victory and defense of our nation

Join a team of grassroots Airmen who believe in your capability to transform the Air Force!

Please discuss this 6-month TDY opportunity with your supervisor / leadership before submitting this application. You will need a signed MOU from your commander if selected.

Eligibility Requirements

  • Officers – Any AFSC
  • Enlisted – Any AFSC
  • Tinkerers who love figuring out why things work
  • Scientists, Technologists, Engineers (STEs) able to:
    • TDY for 6-months
    • Embed within Operational Wing to directly address challenges in the field combating adversarial deployment
    • Meet all deployment requirements
    • Obtain Commander concurrence*

Interested in applying? Keep an eye on your myFSS email for more information on the program and how to apply.

Contact Us

Contact Project Arc Team
Click to send email
Right-click to copy email address